Logistics for Suppliers to Russian Construction Companies

A construction project is a schedule in which finishing cannot start without materials and excavation cannot start without machinery. Imported items — tiles, building services, equipment — have a long supply leg, and if they are late, every following stage slips.

Deliveries tied to the stage of works

If you supply finishing materials, building services systems or site equipment to a construction company in Russia, your delivery date is set by the works schedule. We collect from your premises in the EU or from factories in China, choose the mode by weight and urgency, lodge the export declaration for you and send you proof of export for VAT zero-rating.

What we ship for construction

  • ✓Finishing materials: tiles, stone, panels
  • ✓Building services: heating, ventilation, pumps
  • ✓Construction machinery and attachments
  • ✓Fasteners, hardware and tools
  • ✓Lighting and electrical
  • ✓Lift equipment

Sanctions compliance

We only handle goods that are not subject to EU, UK, Swiss or US sanctions. Before we accept a booking we screen the HS codes and the parties; restricted items are declined.

The industry’s pain points — and how we deal with them

Materials for each stage of works

Deliveries follow the works schedule: finishing materials arrive for finishing, building services for installation. Heavy materials (tiles, stone) go by sea and rail at an attractive rate thanks to their weight.

Machinery: recycling fee and electronic passport

Since 2026, importing machinery into Russia has become more expensive and more complex: a single formula for the recycling fee and registration of the electronic vehicle/machine passport (EPTS/PSM). Before purchase we calculate the total cost — with the recycling fee, duty and VAT, not just the price of the machine.

Breakage of tiles and stone

Heavy fragile materials need correct stowage and securing in the container. We supervise loading at the supplier, insure the consignment and, for expensive stone, photograph every transhipment.

Heavy lifts and out-of-gauge

Tower sections, lift equipment and large machinery travel as project cargo with special vehicles, permits and route approval up to the site.

How we work

Project specification and works schedule → total cost calculation (for machinery, including the recycling fee) → orders placed with a buffer for the supply leg → heavy items by sea/rail, urgent ones by road/air → customs and permit documents → delivery to site in time for the stage.

Indicative rates

ModeRateTransit time
Sea · groupage (LCL)From €200 per package (from €500 per Euro pallet)about 2 weeks
Sea · container (FCL)From €1,800 (20′) · from €2,600 (40′)6–7 days in transit
Road · groupage (LTL)From €850 for 3 pallets (Warsaw → Moscow)4–7 days
Road · full truck (FTL)From €4,500 Warsaw → Moscow · from €6,200 Slovenia → Moscow · from €6,500 Italy → Moscow5–10 days
Air · urgentChargeable weight, minimum order €2002–8 days
Sea + rail (China)On request (calculated on weight and volume)23–55 days

Indicative “turnkey” rates. B2B only: shipments from 50 kg (air: no weight limit), minimum service fee €200. Sea times are for Rotterdam → St Petersburg: groupage about 2 weeks, container 6–7 days in transit; the container must be declared to the port 3 days before the vessel sails.

Frequently asked questions

What is the most economical way to ship tiles and stone from China?

By sea or rail in full containers: for heavy materials, the rate per kilogram is lowest in a container. The key is correct loading and securing at the factory: we supervise stowage, palletising and axle weights and insure the consignment against breakage.

What changed for importing machinery into Russia in 2026?

Since 1 April 2026 a single recycling-fee formula applies to imports via the EAEU, with the difference up to the direct-import level charged additionally; for self-propelled machines a PSM passport is issued and the fee is paid. Before purchase we calculate the total cost: price of the machine + duty + VAT + recycling fee + clearance — sometimes the picture changes the choice of model. Machinery is screened against sanctions lists first, and restricted items are declined.

Do you ship lifts and out-of-gauge equipment?

Yes, as project logistics: route survey, special vehicles and out-of-gauge permits, and coordination with the installation contractor on the sequence in which assemblies are delivered to site.

Can deliveries be linked to the works schedule?

That is exactly how we work: we take the schedule, split the specification by stage and book shipments with a buffer for the supply leg and clearance. Materials arrive at the start of the stage rather than lying on site for months or holding up the crews.

Other industries and sections

More in this section

Request a quote

Reply within 2 business hours

Keywords
We use cookies and basic Yandex Metrica statistics to run the site; extended analytics only with your consent. Details.